Translations:Physical evaluation/26/en
Jump to navigation
Jump to search
It is very important to understand the intended use of the system and the consequences of a power outage. A system that serves a critical function – like at a clinic – must have a more robust design with more PV and a larger battery bank to reduce the potential of a weather-related outage. A generator may also need to be incorporated.