Translations:Commissioning/23/en

From Open Source Solar Project
Revision as of 14:25, 9 March 2021 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • PV source
    • Check the voltage and polarity for each parallel string of PV modules. The value will vary based upon the conditions but should be within an appropriate range given the conditions.
    • If voltages and polarities are correct, close (turn on) all overcurrent protection devices/disconnects between the PV source and the charge controller.
    • Has the charge controller registered the voltage from the PV source? If so, proceed with the process.