Translations:Commissioning/16/en

From Open Source Solar Project
Revision as of 14:25, 9 March 2021 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • Check voltage at the overcurrent protection device/disconnect for the charge controller. Is the voltage and polarity correct for the design?
  • If voltage and polarity is correct, close (turn on) all overcurrent protection devices/disconnects between the battery bank and charge controller.
  • Has the charge controller registered the voltage and turned on? If so, proceed with the process.