Translations:Commissioning/16/en
Jump to navigation
Jump to search
- Check voltage at the overcurrent protection device/disconnect for the charge controller. Is the voltage and polarity correct for the design?
- If voltage and polarity is correct, close (turn on) all overcurrent protection devices/disconnects between the battery bank and charge controller.
- Has the charge controller registered the voltage and turned on? If so, proceed with the process.