Translations:Load evaluation/8/en

From Open Source Solar Project
Revision as of 15:42, 24 March 2021 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • Potential projects that do not currently have an electrical system will also require additional evaluation and design work to ensure that the building will have adequate outlets for (power receptacles) and lighting for the intended use of each room.