Translations:Simplified load evaluation/7/en

From Open Source Solar Project
Revision as of 13:54, 24 March 2021 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • This process can be difficult in locations that do not currently have electricity or that have users that do not have experience with electricity beforehand. In these cases, there is a tendency to over-estimate and under-estimate appliance usage depending on the individual. The result is that more responsibility falls upon the person performing the load evaluation and the system designer to provide guidance and accurate estimates.