Translations:Wiring basic load circuits/2/es

From Open Source Solar Project
Revision as of 18:03, 11 March 2021 by Alex (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

En los diagramas a continuación, los puntos representan conexiones (generalmente hechas con conectores ciegos con rosca). El conductor de puesta a tierra de equipos (PTE) no está incluido por simplicidad.