Translations:Design process overview/6/en

From Open Source Solar Project
Revision as of 16:19, 13 March 2021 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • A person seeking out an off-grid system has not likely used an off-grid system beforehand and may not have even used electricity frequently beforehand. Therefore, it is the responsibility of the designer/installer to responsibly guide the person through all steps of the evaluation, design and installation process.