Translations:Design process overview/6/en
Jump to navigation
Jump to search
- A person seeking out an off-grid system has not likely used an off-grid system beforehand and may not have even used electricity frequently beforehand. Therefore, it is the responsibility of the designer/installer to responsibly guide the person through all steps of the evaluation, design and installation process.