Difference between revisions of "Distribution panel"

From Open Source Solar Project
Jump to navigation Jump to search
Line 10: Line 10:
 
*Phases (L1, L2, L3 etc.)
 
*Phases (L1, L2, L3 etc.)
 
*Sufficient space for necessary [[Special:MyLanguage/Overcurrent protection|overcurrent protection devices]].
 
*Sufficient space for necessary [[Special:MyLanguage/Overcurrent protection|overcurrent protection devices]].
*[[Special:MyLanguage/Weather rating]]
+
*[[Special:MyLanguage/Weather rating|Weather rating]]
*[[Special:MyLanguage/Equipment certification]]
+
*[[Special:MyLanguage/Equipment certification|Equipment certification]]
  
 
</translate>
 
</translate>

Revision as of 08:58, 12 February 2021

Other languages:
English • ‎español
Example of a distribution panel or load center:
Left - Cover removed showing (1) Incoming L1, grounded conductor (neutral) and equipment ground from inverter. (2) Outgoing L1, grounded conductor (neutral) and equipment ground to loads.
Right - Distribution panel with cover.

In an off-grid PV system, the power coming from alternating current (AC) and direct current (DC) power sources that will be used to supply loads will typically pass through a distribution panel that will have overcurrent protection devices that will allow small diameter wires to be run to outlets, lighting and other loads. There will also typically be busbars for equipment grounding conductors and grounded conductors (AC neutral). A distribution panel may be a traditional distribution panel like is commonly seen in grid-connected electrical systems (as depicted in the graphic) or it may be a specifically designed for use in off-grid PV applications. They may differ in appearance, but the purpose and function is the same. A distribution panel must be suitable for the conditions in which it will be used including: