Difference between revisions of "Translations:Distribution panel/1/en"

From Open Source Solar Project
Jump to navigation Jump to search
(Importing a new version from external source)
(Importing a new version from external source)
 
Line 1: Line 1:
[[File:Distributionpanel201105.png|thumb|right|'''Example of a distribution panel or load center:'''<br/> ''Left -'' Cover removed showing (1) Incoming L1, grounded conductor (neutral) and equipment ground from inverter. (2) Outgoing L1, grounded conductor (neutral) and equipment ground to loads.<br /> ''Right -'' Distribution panel with cover.]]
+
[[File:Distributionpanel201105.png|thumb|right|'''Example of a distribution panel or load center:'''<br/> ''Left -'' Cover removed showing (1) Wires from the inverter or power source: L1, grounded conductor (neutral) and equipment ground. (2) Wires to a load: L1, grounded conductor (neutral) and equipment ground.<br /> ''Right -'' Distribution panel with cover.]]

Latest revision as of 09:40, 12 February 2021

Information about message (contribute)
This message has no documentation. If you know where or how this message is used, you can help other translators by adding documentation to this message.
Message definition (Distribution panel)
[[File:Distributionpanel201105.png|thumb|right|'''Example of a distribution panel or load center:'''<br/> ''Left -'' Cover removed showing (1) Wires from the inverter or power source: L1, grounded conductor (neutral) and equipment ground. (2) Wires to a load: L1, grounded conductor (neutral) and equipment ground.<br /> ''Right -'' Distribution panel with cover.]]
Translation[[File:Distributionpanel201105.png|thumb|right|'''Example of a distribution panel or load center:'''<br/> ''Left -'' Cover removed showing (1) Wires from the inverter or power source: L1, grounded conductor (neutral) and equipment ground. (2) Wires to a load: L1, grounded conductor (neutral) and equipment ground.<br /> ''Right -'' Distribution panel with cover.]]
Example of a distribution panel or load center:
Left - Cover removed showing (1) Wires from the inverter or power source: L1, grounded conductor (neutral) and equipment ground. (2) Wires to a load: L1, grounded conductor (neutral) and equipment ground.
Right - Distribution panel with cover.