Difference between revisions of "Translations:Design process overview/6/en"
Jump to navigation
Jump to search
(Importing a new version from external source) |
(Importing a new version from external source) |
||
Line 1: | Line 1: | ||
− | * | + | *It is likely that a person that wants an off-grid system has not likely used a system of this type and may not have even used electricity frequently beforehand. Therefore, it is the responsibility of the designer and installer to responsibly guide the person through all steps of the evaluation, design and installation process. |
Latest revision as of 17:20, 13 March 2021
- It is likely that a person that wants an off-grid system has not likely used a system of this type and may not have even used electricity frequently beforehand. Therefore, it is the responsibility of the designer and installer to responsibly guide the person through all steps of the evaluation, design and installation process.